Free worldwide delivery on every order10-year structural warranty on every piece.Solid wood, made by hand30-day returns, honored in fullFree worldwide delivery on every order10-year structural warranty on every piece.Solid wood, made by hand30-day returns, honored in full

console table

S-Curve Pedestal Console Table in Solid Hardwood

47 reviews · In stock
$2,550.00
One slim pedestal twists up from a low rounded foot in a tight S, thinning at the waist and flaring again where it meets the top. Everything else stays quiet. The top is a straight rectangular plank with...
Size 30"W x 12"D x 32"H
1
♡ Save to wishlist

Protected delivery. Carefully packed and protected, with tracking emailed the moment it ships.

Free delivery worldwide. Tracking emailed the moment it ships.

30-day returns, honored in full. How returns work →

  • Solid hardwood no veneer, no MDF
  • Natural finish true grain, rustic warmth
  • Honest origin we tell you where it's made
  • 10-year structural warranty

10-year warranty

Structural coverage on every joint and panel, honored from delivery day.

Packed to arrive perfect

Ships disassembled in a corner-guarded crate: safer on the road, lower freight cost, and our team guides you step by step if assembly ever gets tricky.

Returns we honor

30 days, no maze. If it’s not right, we fix it.

Honest origin

We tell you exactly where and how it’s made.

Natural wood grain detail

Details

About this piece

One slim pedestal twists up from a low rounded foot in a tight S, thinning at the waist and flaring again where it meets the top. Everything else stays quiet. The top is a straight rectangular plank with a soft rounded edge and no visible hardware, and it extends well past the pedestal to the right, leaving a long clear stretch for candles or a pile of post. Grain in the twist bunches and stretches with the curve, mid brown warming toward gold on the raised faces.

The pedestal is carved from real solid wood in one piece, not laminated and not skinned in a printed veneer. Files and scrapers do the last of the work, so the curve stays fair from every side. Yours is started after you order, which means the grain wrapping your S will not match this one exactly.

It arrives disassembled, top and pedestal wrapped and boxed separately, which protects the narrow waist and trims the freight bill. Printed assembly instructions travel in the carton, with email support behind them. Free worldwide delivery and 30-day returns.

Specifications

Made to be measured

  • Material Solid wood blocks, joined into one sturdy form
  • Construction Solid wood, no veneer / MDF
  • Joinery Blocks shaped, sanded and joined as one piece
  • Finish Natural finish, warm tone and true grain
  • Dimensions 4 sizes, 30"W x 12"D x 32"H up to 42"W x 12"D x 32"H
  • Origin Built in our Southeast-Asia workshop
  • Assembly Ships in parts for safe transit; easy assembly included
  • Warranty 10-year structural warranty
S-Curve Pedestal Console Table in Solid Hardwood dimension diagram

42"W x 12"D x 32"H

Shown at the largest of 4 available sizes.

Owner reviews

4.9 out of 5

★★★★★ Based on 47 verified owners

★★★★★
“It arrived crated like a piece of art and assembled in fifteen minutes. The grain is unreal.”
Daniel R. · Verified owner
★★★★★
“They gave me an exact delivery date and hit it. Feels like it’ll outlive me.”
Priya N. · Verified owner
★★★★☆
“Genuinely solid - you feel the weight. Otherwise flawless.”
Marcus T. · Verified owner

Before you buy

Questions, answered honestly

What happens after I place my order?+

Your piece is built for your order, and you stay in control the whole way. We send you photo updates at every stage of the build, from the first cut to the final finish. At each step we wait for your approval: only when you are happy do we move to the next stage, and the piece ships the same way. Until production starts, you can cancel at no cost.

How is it delivered?+

Delivery is free worldwide, with tracking emailed the moment it ships. Assembly is simple, with clear instructions and hardware included. If you ever get stuck, write to hello@burlholt.com and our team walks you through it step by step.

Can I return it?+

Yes. 30 days, honored in full. If it isn’t right, write to us and we make the return simple, with home collection available for oversized pieces.

Where is it made?+

Built by hand in our Southeast-Asia workshop from solid hardwood, then finished to order.

How do I care for the wood?+

Dust with a soft cloth and condition the wood with a light coat of furniture oil once or twice a year.

Keep exploring

More ways to browse