10-year warranty
Structural coverage on every joint and panel, honored from delivery day.
Bathroom Vanity
Protected delivery. Carefully packed and protected, with tracking emailed the moment it ships.
Free delivery worldwide. Tracking emailed the moment it ships.
30-day returns, honored in full. How returns work →
Structural coverage on every joint and panel, honored from delivery day.
Ships disassembled in a corner-guarded crate: safer on the road, lower freight cost, and our team guides you step by step if assembly ever gets tricky.
30 days, no maze. If it’s not right, we fix it.
We tell you exactly where and how it’s made.

Details
About this piece
This bathroom vanity is shaped from a solid hardwood cabinet, not laminate over particle board. It reads as understated, built for a room that already has enough going on.
Design Details
Material and Craft
Where It Fits
Specifications

80"W x 30"H x 18"D
Shown at the largest of 5 available sizes.
Owner reviews
★★★★★ Based on 47 verified owners
“It arrived crated like a piece of art and assembled in fifteen minutes. The grain is unreal.”
“They gave me an exact delivery date and hit it. Feels like it’ll outlive me.”
“Genuinely solid - you feel the weight. Otherwise flawless.”
In the same spirit
Designed to live together

Bathroom Cabinet
From $3,498

Live Edge Vanity
From $2,214.30

Vessel Sink
From $1,410.86

Bathroom Shelf
From $2,460
Before you buy
Your piece is built for your order, and you stay in control the whole way. We send you photo updates at every stage of the build, from the first cut to the final finish. At each step we wait for your approval: only when you are happy do we move to the next stage, and the piece ships the same way. Until production starts, you can cancel at no cost.
Delivery is free worldwide, with tracking emailed the moment it ships. Assembly is simple, with clear instructions and hardware included. If you ever get stuck, write to hello@burlholt.com and our team walks you through it step by step.
Yes. 30 days, honored in full. If it isn’t right, write to us and we make the return simple, with home collection available for oversized pieces.
Built by hand in our Southeast-Asia workshop from solid hardwood, then finished to order.
Dust with a soft cloth and condition the wood with a light coat of furniture oil once or twice a year.
Keep exploring