10-year warranty
Structural coverage on every joint and panel, honored from delivery day.
Makeup Vanity
Free shipping on every order, worldwide. Estimated delivery is 12 to 17 business days: 7 to 10 to prepare your piece and 5 to 7 in transit. Your tracking number is emailed within 1 to 2 business days of dispatch.
If the frame or joinery fails under normal home use within ten years of delivery, we repair or replace the piece. Hardware we supplied is covered too. Warranty terms
Return an unused piece within 30 days of delivery, in its original condition and packaging with all hardware. If it arrived damaged, defective or incorrect, we cover the return shipping. Refund policy
Each piece is carefully packed for transit and tracked from dispatch. If an item is missing, tell us within 48 hours of delivery. If a piece arrives damaged, send us photos and we cover the return shipping.
Assembly. Each piece ships in parts for safe transit and assembles easily, with clear instructions and the hardware included.
Care. Dust weekly with a soft dry cloth. Once or twice a year, wipe on a thin coat of furniture oil and buff off the excess. Wipe spills promptly. Avoid silicone sprays and supermarket polishes.
Placement. Keep the piece away from active heating vents and constant direct sun, in a room with reasonably stable humidity. Full care guide
Shipping. Free on every order, worldwide. Estimated delivery is 12 to 17 business days: 7 to 10 to prepare your piece and 5 to 7 in transit. Orders placed after 5:00 PM PST are processed the next business day. Tracking is emailed within 1 to 2 business days of dispatch.
Changes. To change or cancel an order, email hello@burlholt.com within 6 hours of placing it.
Returns. Return an unused piece within 30 days of delivery, in its original condition and packaging with all hardware. We cover return shipping for items that are defective, damaged in transit or incorrect. Custom or personalized pieces cannot be returned. Approved refunds are processed within 2 business days of inspection.
Structural coverage on every joint and panel, honored from delivery day.
Ships disassembled in a corner-guarded crate: safer on the road, lower freight cost, and our team guides you step by step if assembly ever gets tricky.
30 days, no maze. If it’s not right, we fix it.
We tell you exactly where and how it’s made.

Details
A long, slim top rests on two very different supports. A narrow cabinet with three stacked drawers holds up the left end. At the right, a single sweeping S curve of wood carries the other end and ends in a flat foot.
You can order the vanity in four finishes: Black, Oak, Brown and Walnut. Its pedestal and cabinet are shaped from solid hardwood and made after you order. Choose from 4 sizes, from 47" to 71" wide.
Use it as a dressing table in a bedroom or as a slim desk in a hall. The open gap between the two supports leaves space for a seat. Free delivery reaches every country, and an unused vanity can be returned within 30 days.
Specifications

71"W x 32"H x 18"D
Shown at the largest of 4 available sizes.
Owner reviews
★★★★★ Based on 47 verified owners
“It arrived crated like a piece of art and assembled in fifteen minutes. The grain is unreal.”
“They gave me an exact delivery date and hit it. Feels like it’ll outlive me.”
“Genuinely solid - you feel the weight. Otherwise flawless.”
In the same spirit

Makeup Vanity
From $2,555

Makeup Vanity
From $2,843

Makeup Vanity
From $2,452

Makeup Vanity
From $2,555
Designed to live together
Before you buy
Your piece is built for your order, and you stay in control the whole way. We send you photo updates at every stage of the build, from the first cut to the final finish. At each step we wait for your approval: only when you are happy do we move to the next stage, and the piece ships the same way. To change or cancel an order, write to us within 6 hours of placing it.
Delivery is free worldwide, with tracking emailed the moment it ships. Assembly is simple, with clear instructions and hardware included. If you ever get stuck, write to hello@burlholt.com and our team walks you through it step by step.
Yes. Unused pieces can be returned within 30 days of delivery in their original packaging. Write to us with your order number and we send return instructions once the return is approved. Full details are in our refund policy.
Built by hand in our Southeast-Asia workshop from solid hardwood, then finished to order.
Dust with a soft cloth and condition the wood with a light coat of furniture oil once or twice a year.